The power supply will be suspended in the following areas on (01-12-2021 to 30-12-2021) from 09:00 am to 04:00 pm for maintenance work. Sup...
The power supply will be suspended in the following areas on (01-12-2021 to 30-12-2021) from 09:00 am to 04:00 pm for maintenance work. Supply will be resumed before 05:00 pm if the works are completed.
Feeder | Outage Type | Outage Date And Time | Expected Restore Date And Time | Duration Of Outage | Reason | Sub Station | Division |
---|---|---|---|---|---|---|---|
660303-NOCHIYAM | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
660307-SAMAYAPURAM | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
663105-LALGUDI | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | POOVALUR 110 KV | Lalgudi |
660304-AYAKUDY | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
663101-VELLANUR | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | POOVALUR 110 KV | Lalgudi |
663106-ANBIL | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | POOVALUR 110 KV | Lalgudi |
660301-TOLGATE | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
660305-CETHAR | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
663102-POOVALUR | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | POOVALUR 110 KV | Lalgudi |
660302-EDAIYAPATTY | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Srirangam |
660306-THENOOR | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | SAMAYAPURAM 110/22-11KV | Lalgudi |
663104-NANNIMANGALAM | Scheduled | Dec 23, 2021 9:00:00 AM | Dec 23, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | POOVALUR 110 KV | Lalgudi |
660901-PETTAVAITHALAI | Scheduled | Dec 21, 2021 9:45:00 AM | Dec 21, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | PETTAVAITHALAI 110 KVSS | East/Trichy |
660902-INDUSTRIAL | Scheduled | Dec 21, 2021 9:45:00 AM | Dec 21, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | PETTAVAITHALAI 110 KVSS | East/Trichy |
660901-PETTAVAITHALAI | Scheduled | Dec 21, 2021 9:45:00 AM | Dec 21, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | PETTAVAITHALAI 110 KVSS | East/Trichy |
660902-INDUSTRIAL | Scheduled | Dec 21, 2021 9:45:00 AM | Dec 21, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | PETTAVAITHALAI 110 KVSS | East/Trichy |
660103-JEEYAPURAM | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Urban/Trichy |
660108-THIRUPARAITHURAI | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | East/Trichy |
661202-PUTHANATHAM | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
661206-WATERWORKS | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
660105-WORAIUR | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Urban/Trichy |
660109-COLLECTORWELLWATERWORKS | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Srirangam |
661203-MARUNGAPURI | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
T.EDAYAPATTY | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
660106-CHINTHAMANI | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Urban/Trichy |
660111-NANDHIKOVIL | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Urban/Trichy |
661204-SEVALPATTI | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
660101-AMMAMANDAPAM | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Srirangam |
660107-TEPPAKULAM | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | KAMBARASAMPETTAI 110 KV | Urban/Trichy |
661201-THUVARANKURICHY | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
661205-K.N.PATTI | Scheduled | Dec 18, 2021 9:45:00 AM | Dec 18, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THUVARANKURICHY | Manapparai |
664506-22KVOMANTHUR | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664501-11KVPUTHANAMPATTYFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664502-THINNANUR11KVFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664503-NAGALAPURAMFEEDER11KV | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664504-T.KALATHUR11KVFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664205-PALAKKARAI | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664209-NALLAVANNIPATTY | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
663302-SOBANAPURAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
663306-VAIRICHETTYPALAYAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
664201-PULIVALAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664206-KEERAMBUR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664210-CWSS | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
663303-NAGANALLUR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
663307-K.PUDUR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
664202-NAGALAPURAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664207-MUTHAIYAMPALAYAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664211-BAZAAR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
663304-B.METTUR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
663308-UPPILIYAPURAM | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
664203-KOLLAPATTY | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
664208-MURUGUR | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | THURAIYUR | Thuraiyur |
663301-KOPPAMPATTY | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
663305-MARADY | Scheduled | Dec 17, 2021 9:00:00 AM | Dec 17, 2021 5:00:00 PM | 08:00 hours | Substation Maintenance | KOPPAMPATTY 110 KV | Thuraiyur |
664502-THINNANUR11KVFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664503-NAGALAPURAMFEEDER11KV | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664504-T.KALATHUR11KVFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664501-11KVPUTHANAMPATTYFEEDER | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
664506-22KVOMANTHUR | Scheduled | Dec 18, 2021 9:00:00 AM | Dec 18, 2021 4:00:00 PM | 07:00 hours | Substation Maintenance | PUTHANAMPATTY 110 KV SS | Thuraiyur |
662703-11KVPOTHAPATTYFEEDER | Scheduled | Dec 16, 2021 10:00:00 AM | Dec 16, 2021 1:00:00 PM | 03:00 hours | Substation Maintenance | VAIYAMPATTY 110/33-11 KV | Manapparai |
662704-11KVMANPATHAIFEEDER | Scheduled | Dec 16, 2021 10:00:00 AM | Dec 16, 2021 1:00:00 PM | 03:00 hours | Substation Maintenance | VAIYAMPATTY 110/33-11 KV | Manapparai |
662701-11KVREDDIAPATTYFEEDER | Scheduled | Dec 16, 2021 10:00:00 AM | Dec 16, 2021 1:00:00 PM | 03:00 hours | Substation Maintenance | VAIYAMPATTY 110/33-11 KV | Manapparai |
662705-11KVWATERWORKSFEEDER | Scheduled | Dec 16, 2021 10:00:00 AM | Dec 16, 2021 1:00:00 PM | 03:00 hours | Substation Maintenance | VAIYAMPATTY 110/33-11 KV | Manapparai |
662702-11KVPONNAMBALAPATTYFEEDER | Scheduled | Dec 16, 2021 10:00:00 AM | Dec 16, 2021 1:00:00 PM | 03:00 hours | Substation Maintenance | VAIYAMPATTY 110/33-11 KV | Manapparai |
660705-INDUSTRIAL | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660709-TOWNMANAPARAI | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660802-THILLAINAGAR | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660806-BIGBAZZARSTREET | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660811-U.KKOILFEEDER | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660706-THOGAMALAI | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660710-POIGAIPATTY | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660803-PALAKKARAI | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660812-ANNAMALAINAGAR | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660707-SEVALLUR | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660712-PODANGUPATTY | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660804-ROCKFORT | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660813-ULAVARSANDHAI | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660708-MANJAMPATTI | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 4:00:00 PM | 06:15 hours | Substation Maintenance | MANAPPARAI 110 KV | Manapparai |
660801-GANDHIMARKET | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
660805-THENNUR | Scheduled | Dec 4, 2021 9:45:00 AM | Dec 4, 2021 5:00:00 PM | 07:15 hours | Substation Maintenance | THENNUR 110 /33-11KV SS | Urban/Trichy |
Power shutdown areas in Tiruchirapalli (01-12-2021 to 30-12-2021)
Tamil Nadu TNEB Complaint Number & Info
Power Supply Complaints: 1912
In addition to 1912, Consumers can raise power supply related complaints with the following phone numbers which are functional 24X7- 044-28521109
- 044-28524422
- 9445850811 (Whatsapp)
Hon'ble Minister for Electricity, Prohibition and Excise, GoTN
- Camp office: 044-24959525
Bill Calculator - TNEB Online Payment
Related Search:
today power shutdown areas in salem power shutdown message tneb power shutdown details in erode tneb power shutdown tomorrow coimbatore power shutdown in coimbatore 2020 power shutdown sms power shutdown schedule in coimbatore tomorrow chennai power shutdown schedule 2020
COMMENTS