-->

Power shutdown areas in Namakkal - July 2021


Power Shut Down (01-07-2021 to 30-07-2021)

The power supply will be suspended in the following areas on Today  (01-07-2021 to 31-07-2021) from 09:00 am to 02:00 pm for maintenance work. Supply will be resumed before 02:00 pm if the works are completed.




TANGEDCO Outages Details
Outage date Town Substation Feeder Area affected Type of Work From To
23-07-2021 Rasipuram RASIPURAM 110 KV RASIPURAM 110 KV Mill,Pudhupalayam,Rasipuram Town,Vellalapatty,Oduvankurichi,Ealur,Kathiranallur,Gurusamypalayam,Rasipuram Town II Maintenance 09:00 14:00
26-07-2021 Tiruchengode PARUTHIPALLY 110 KV PARUTHIPALLY 110 KV Vaiyappamalai,Parathipally,Vattur,Konniyar Maintenance 09:00 14:00
27-07-2021 P.Velur KABILARMALAI 110 KV KABILARMALAI 110 KV Velur,Pothanur,Veeranampalayam,Pandamangalam,Pillikkalpalayam,Jedarpalayam,Kothamangalam,Ayyampalayam,Industrial,TWAD,Dedicated(Kabilakurichi) Maintenance 09:00 12:01
27-07-2021 P.Velur P.VELUR 110 KV NALLIYAMPALAYAM Nalliyanmpalayam, Vetdukatuputhur,By Pass road, Kuppuchipalayam, Panamudipalayam, Vellapalayam, Maravaapalayam. Tree Clearance 10:00 12:00
27-07-2021 Mallasamudram MALLASAMUDRAM 110 KV MALLASAMUDRAM 110 KV Mallasamudram,Vennandur,Moorpalayam,Vambadithalam,Attayampatty,Paruthipally Maintenance 09:00 14:00
29-07-2021 Namakkal NAMAKKAL 110/22 KV NAMAKKAL 110/22 KV Namakkal Water Works,Aniyapuram,Thoosur,Local - I,Local - II,Muthugapatty,Mudalaipatty,Keerambur,Collectorate,Local - III,Thottipatty Maintenance 09:00 14:00


Disclaimer: TNEBONLINE is not associated with Tamil Nadu Electricity Board, For TNEB official website visit - www.tangedco.gov.in

Read it too

Comments