Power shutdown areas in Namakkal - February 2021


Power Shut Down (01-02-2021 to 28-02-2021)

The power supply will be suspended in the following areas on Today  (01-02-2021 to 28-02-2021) from 09:00 am to 02:00 pm for maintenance work. Supply will be resumed before 02:00 pm if the works are completed.



Date: 03-02-2021
Town: P.Velur
Substation: KABILARMALAI 110 KV
Area affected: Velur,Pothanur,Veeranampalyam,Pandamangalam,Pillikkalpalayam,  Jedarpalayam, Kothamangalam,Ayyampalayam,Industrial,TWAD,Dedicated(Kabilakurichi)

Date: 05-02-2021
Town: Namakkal
Substation: NAMAKKAL 110/22 KV
Area affected: Namakkal Water Works,Aniyapuram,Thoosur,Local I,Local II,Muthalaipatty, Muthugapatty,Keerambur,Collectorate Local III,Thottipatty

Date: 09-02-2021
Town: Tiruchengode
Substation: TIRUCHENGODE 110 KV
Area affected: Rajagoundampalayam,South Urban,North Urban,Mill,  Gollapatty, Devanankurichy, Palamadai,Water Works,Varagoorampatty,Workshop

Date: 30-01-2021
Town: P.Velur
Substation: P.VELUR 110 KV
Area affected: Nalliyampalayam,Velur,Pothanur,V.Suriyampalayam,Devarayasamuthiram,Paramathy

Date: 11-02-2021
Town: Rasipuram
Substation: NAMAGIRIPET 110 KV
Area affected: Koraiyaru,Pudupatty,Namagiripet Town,Pachudaiyampalayam,CWSS,Pattanam

Date: 12-02-2021
Town: Namakkal
Substation: Sendamangalam 110/22 KV SS
Area affected: Siviyampalayam,CWSS,Sendamangalam,Palayapalayam,Potanam

Date: 16-02-2021
Town: Namakkal
Substation: NALLUR 110 /22KV SS
Area affected: Nallur Mill I,Velur,Jameen Elampillai,Solasiramani,Mill II,Maniyanur,Nagapalayam,Chithalandur,Water Works,Mill III

Date: 24-02-2021
Town: Tiruchengode
Substation: MALLASAMUDRAM 110 KV
Area affected: Mallasamudram,Vennandur,Moorpalayam,Vembudithalam,Attayampatty,Paruthipally